Import guide · Logistics

Shipping Times from China to Africa, the Middle East and Russia (2026 Table)

Updated 9 September 2026 · 6 min read Shipping Timelines

Quick answer: Total door-to-port time from China is typically 45–65 days: about 20 days in China (order → inspection → paperwork → loading) plus sailing time by route — Jebel Ali 20–30 days, Mombasa 30–40, Lagos 35–45, and Vladivostok just 3–7. The fastest routes to Central Asia run overland or by rail via Khorgos in 12–20 days.

"How long does shipping take?" is the second question every buyer asks after price — and the honest answer is a range, not a number, because schedules, congestion and vessel availability all move it. Below is the table we quote from, based on shipments we actually run in 2026, plus the factors that push a date in either direction.

Sailing and door-to-port times by route

DestinationPortSailing timeTotal door-to-port*
UAEJebel Ali20–30 days≈ 45 days
Saudi ArabiaJeddah / Dammam25–35 days≈ 50 days
KenyaMombasa30–40 days≈ 55 days
TanzaniaDar es Salaam35–45 days≈ 60 days
NigeriaLagos (Tin Can / Apapa)35–45 days≈ 55–65 days
Russia (Far East)Vladivostok3–7 days≈ 25–30 days
Kazakhstan / Central AsiaKhorgos crossing, overland/rail12–20 days≈ 30–40 days
MexicoManzanillo25–35 days≈ 50 days
ChileSan Antonio / Valparaíso35–40 days≈ 55–60 days

*Total = ~20 days in China (order to loading) + sailing. 2026 typical ranges from Tianjin or Shanghai; confirm the live schedule at booking.

What happens during the 20 days in China

The pre-shipment window is the part buyers underestimate. In sequence: refurbishment and detailing (if contracted), the final inspection, export documentation (commercial invoice, packing list, certificate of origin, per-vehicle export licence), customs declaration, and container loading or Ro-Ro drop-off. Skipping refurbishment compresses this to 7–10 days; a batch of 6+ vehicles can stretch it slightly.

Four factors that move your dates

  • Sailing schedules. Container services on major lanes (Jebel Ali, Mombasa) are near-weekly. Ro-Ro sailings on thin routes can leave every 2–3 weeks — waiting for the next vessel is the most common delay.
  • Port congestion. Destination-side congestion (Lagos is the classic case) can add days to weeks before berthing and discharge.
  • Peak seasons. Space tightens ahead of summer and year-end. Book 2–3 weeks earlier than you normally would.
  • Documentation readiness. If the buyer-side paperwork (Form M, agent details, consignee details on the bill of lading) is not final when the vessel is ready, loading slips to the next departure.
Planning tip: for any date-critical arrival (a wedding car, a fleet launch), budget door-to-port + 2 weeks of buffer, and prefer container services with weekly departures over infrequent Ro-Ro sailings.

Frequently asked questions

How long does it take to ship a used car from China?

Total door-to-port is typically 45–65 days: ~20 days in China from order to loading, plus 20–45 days sailing depending on destination. Vladivostok is the outlier at just 3–7 days sailing.

What is the fastest route from China?

Vladivostok, Russia (3–7 days sailing from northern ports). Central Asia is second — 12–20 days by truck or rail via Khorgos. West Africa and Latin America are the longest.

Is RoRo faster than container?

Sailing time is similar; schedule frequency is the difference. Ro-Ro departures are less frequent on thin routes, so the wait for the next vessel often dominates. Container services on major lanes run weekly.

How do I track the car at sea?

Track the bill of lading number with the carrier (and container + seal numbers for boxes). We send loading photos and video before departure and notify buyers at departure and arrival.

Next step

Want a quote with a real sailing schedule?

Tell us the destination port and quantity. The quote comes with the current vessel option and its departure window.

WhatsApp us now Use inquiry form

Related guides

进口指南 · 物流

从中国到非洲、中东与俄罗斯的运输时效(2026 表)

更新于 2026年9月9日 · 阅读约 6 分钟 运输 时间表

快速回答:中国门到港总时间通常 45–65 天:约 20 天在中国(下单 → 检测 → 单证 → 装车),加按航线的航行时间——杰贝阿里 20–30 天、蒙巴萨 30–40、拉各斯 35–45,符拉迪沃斯托克仅 3–7 天。最快到达中亚的路线经霍尔果斯陆运或铁路 12–20 天。

"运输要多久?"是买家在价格之后第二个必问的问题——诚实的答案是一个区间,而非一个数字,因为船期、拥堵与船舶可用性都会推动它。以下是我们在 2026 年实际运行的报价表,加上把日期向任一方向推的因素。

按航线的航行与门到港时间

目的地港口航行时间门到港总时长*
阿联酋杰贝阿里20–30 天≈ 45 天
沙特阿拉伯吉达 / 达曼25–35 天≈ 50 天
肯尼亚蒙巴萨30–40 天≈ 55 天
坦桑尼亚达累斯萨拉姆35–45 天≈ 60 天
尼日利亚拉各斯(Tin Can / Apapa)35–45 天≈ 55–65 天
俄罗斯(远东)符拉迪沃斯托克3–7 天≈ 25–30 天
哈萨克斯坦 / 中亚霍尔果斯口岸,陆运/铁路12–20 天≈ 30–40 天
墨西哥曼萨尼约25–35 天≈ 50 天
智利圣安东尼奥 / 瓦尔帕莱索35–40 天≈ 55–60 天

*总时长 = 中国约 20 天(下单到装车)+ 航行。2026 年天津或上海出发典型区间;订舱时确认现行船期。

中国的 20 天里发生了什么

装运前窗口是买家低估的部分。依次:整备与美容(若签约)、终检、出口单证(商业发票、装箱单、原产地证、单车出口许可证)、海关申报、集装箱装车或滚装落车。跳过整备可压缩至 7–10 天;6 台以上批次略拉长。

推动您日期的四个因素

  • 船期。主要航线(杰贝阿里、蒙巴萨)集装箱服务近乎每周。稀薄航线滚装可能每 2–3 周一班——等下一艘船是最常见的延误。
  • 港口拥堵。目的地拥堵(拉各斯是典型)可在靠泊与卸货前增加数天至数周。
  • 旺季。夏季前与年末前舱位收紧。比平时早订 2–3 周。
  • 单证就绪。若买方侧单证(Form M、代理信息、提单收货人信息)在船就绪时未定稿,装车会滑到下一班。
规划提示:对任何日期攸关的到货(婚车、车队发布),预算 门到港 + 2 周缓冲,并优先选每周班期的集装箱服务而非不频繁的滚装。

常见问题

从中国运二手车要多久?

门到港通常 45–65 天:中国约 20 天从下单到装车,加按目的地 20–45 天航行。符拉迪沃斯托克是例外,仅 3–7 天航行。

从中国最快的路线是哪条?

俄罗斯符拉迪沃斯托克(北部港口起运 3–7 天航行)。中亚第二——经霍尔果斯铁路或卡车 12–20 天。西非与拉美最长。

滚装比集装箱快吗?

航行时间相近;是班期频率的差异。稀薄航线滚装班期较少,因此等下一艘船往往占主导。主要航线集装箱服务每周一班。

我在海上如何追踪车辆?

凭船公司提单号追踪(集装箱货另凭箱号与封条号)。我们在开航前发送装车照片与视频,并在开航与到港节点通知买家。

下一步

想要带真实船期的报价?

告知目的港与数量。报价附当前船公司选项与其开航窗口。

立即 WhatsApp 联系 使用询盘表单

相关指南